Site Preparation and Earthworks Experience

Early Earthworks preparation completed and ready for next construction phase of the Biomass Power Plant.

In July 2012 Hemaras began the earthworks – phase one of construction of a Biomass Power Plant near La Crete, northern Alberta for Mustus Energy Ltd.

Hemaras mobilized the site immediately after the award of the project; including 20 pieces of heavy equipment and all associated services to provide continuous 12 hour work days and fast progress on the project.

The engineering support of ARAS which is an affilated company, has proven to be an asset to the progress of the project by providing prompt drawings, data sheets and engineering services in general, therefore increasing the quality of the work that we can provide to our client

Hemaras anticipates that this phase of the project will be completed under budget and earlier than originally anticipated.

Hemaras engaged mainly local businesses and sourced skilled labour in the area.

Key successes for Hemaras have been;

  • Ensuring our Health, Safety and Environmental program is fully implemented and everyone is following all policies, procedures and documentation requirements,
  • Identifying cost and time savings to pass onto our client, and
  • Making sure that quality control and quality assurance standards are met and exceeded.

Pipeline Construction Experience

The management team of Hemaras has experience in pipeline projects including installation of 1500 km of pipeline in various diameters up to 36” with associated facilities.  These projects provided extensive experience constructing cross-country pipelines including stringing to hydro-testing.

Examples below are two projects that have been completed and commissioned.

  • 140 km of 30” gas pipeline parallel to the shore of the Caspian Sea the main portion of which was through rice paddies and marsh lands
  • 550 km cross country 20” pipeline from Isfahan to a port in the Persian Gulf (Bandar Abbas) including a leak detection system and 550 km installation of fibre optic cable.

Pump and Compressor Stations/ Mechanical Construction and Erection

Hemaras’s management team has executed pipeline related projects including; pump and compressor stations, tank erection and oil terminals.

  • Ahwaz-Ray new crude oil pumping station: 5 turbo driven pump stations and 2 intermediate trap stations where each pumping station consists of 4 turbo driven pumps with total installation horse power of 26,000 hp.
  • Construction of 6 pump stations from Persian Gulf Port of Bandar Abbas to Isfahan of which two pump stations utilise 6 turbo driven pumps and the other four stations are equipped with 13 electro pumps in order to transfer 360,000 barrels/day of refined product.
  • Construction of triple pipeline (32″, 30″ and 20″) using marine equipment in order to transport and install about 6 km of pipeline and related facilities to commission crude oil off loading jetty to feed the Bandar Abbas Refinery.

Tank Erection and Oil Terminals

Constructing storage and balance tanks in various capacities up to 40,000 m3 and related work such as piping, gauging, fire fighting, etc. in Persian Gulf (Bandar Abbas Refinery) and other parts of the region.

Revamping refinery in Persian Gulf (22,000 to 50,000 BPD)